Turnkey Engineering & Commissioning

Core Industrial Power & Automation Capabilities

We engineer sub-second reverse power prevention, automated APFC detuned capacitor banks, pharmaceutical-grade SCADA, and ISO-50001 energy telemetry with verifiable on-site test reports across Pakistan.

Completed Sites120+ Plants
Fuel SavedUp to 42%
ROI Estimator

Calculate Savings based on your Industry

Real-time Formula Engine
1000 kW / kVA
50 kW (SME)1000 kW (Standard MW)2500 kW (Heavy Mill)
0.82
⚠️ Incurs Low-PF Penalties
8 hrs/day
Based on 26 working days/month
Projected Engineering Benefits for Textile Spinning & Weaving:
Monthly Fuel Savings
PKR 5.81M
~20,384 Liters Displaced
LESCO Penalty Eliminated
PKR 2.41M
Locks Cos φ to 0.99 with 556 kVAR APFC
Capital Payback Period
4 Months
Solar Sync ROI: ~0.8 Years
Annual CO2 Displacement
629 Tons CO₂
Qualifies for Green Industrial Audit
Cost Savings Calculator

Calculate your Return on Investment now!

Tired of high fuel bills and generator wear during load shedding? See exactly how many liters of diesel you can displace every month without risking reverse-power generator damage.

HSD Benchmark: PKR 285 / L
500 kVA
100 kVA (SME)500 kVA1,200 kVA2,500 kVA (Heavy Mill)
6 Hours / Day
2 Hours (Peak Shaving)6 Hours (Standard Load Shedding)16 Hours (Continuous)
Live SCADA Simulation Readout
Mode: 40% Offset
Estimated Monthly Diesel Saved
~6,864 L
Displaced during daylight running
Estimated Annual Cost Savings
PKR 23.47M
~PKR 1.96M / Month
Environmental Carbon Offset:221 Tons CO₂ / Year
Recommended Synchronization Hardware:

ComAp InteliCompact / DSE Genset Controller + 2x Huawei SUN2000-100KTL-M2 (200kW)

Engineered with zero reverse power flow trip prevention circuitry.
Adds calculated 500 kVA package directly to your Cart for instant engineering review.
Technical Submittal Scope

6 Turnkey Engineering Services & Specifications

Click drawers to expand standards, deliverables & hardware

Solar Installation

Turnaround: 3 to 6 weeks depending on scale

Solar-Genset Synchronizing

Turnaround: 7 to 14 days on-site commissioning

Industrial Automation

Turnaround: 2 to 8 weeks depending on I/O count

Power Factor Correction Panels

Turnaround: 5 to 10 working days

Energy Management Systems

Turnaround: 1 to 3 weeks

Security Cameras & Networking

Turnaround: 1 to 2 weeks